Design of structures in medium or extremely sloped terrains is a demanding and challenging engineering task. Depending on the depth of foundations of the future buildings, different methods of securing foundation pit sides are used. Extremely high vertical excavations cannot utilize the standard methods of securing ground stability (use of “L” segments) so somewhat more complicated and demanding solutions must be found. This paper shows the method of temporary securing of the vertical excavation during the building construction, using the prestressed geotechnical anchors in combination with the RC frame, on the example of the Apartment complex in Montenegro.

Articles are published under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence (https://creativecommons.org/licenses/by/4.0/). This licence allows anyone to copy, redistribute, remix, transform and build upon the material in any medium or format, for any purpose, including commercially, provided that appropriate credit is given to the original authors and source, a link to the licence is provided, and any changes made are indicated.
0
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.